Customer: Petronas Gas Sabah
Status: Completed in October 2010
Equipment: Caterpillar 3516, Diesel Engine Generator, 1 MW
Overview:
- Certified ATEX "Ex d e [ia] ib px IIA T4 Gc" Control Panel ( Purging System ) with Woodward Controller, Redundant AVR ( Excitation Controller ), Allen Bradley ControlLogix PLC with Allen Bradley Panel View Plus (HMI).
Customer: MISC Berhad, LNG Vessel/Ship
Status: Completed in November 2010
Equipment: Blohm & VossTurbo Generators, 2.8 MW x 2 units.
Overview:
- Retrofit Mechanical Governor to Woodward 505 Electronic Speed Control, and Woodward CPC II.
- ABS certification for design.
Status: Completed in April 2010
Equipment: Steam Turbine Driven Gas Compressors ( x 2 units )
Overview:
- Retrofit obsolete Triconex Trisen TS410 Turbine Controller with Woodward 505R (Redundant) Turbine Control.
Customer/End User: SESB Sandakan Power Plant ( Sabah Electricity Sdn. Bhd ), Malaysia.
Status: Completed (April 2010)
Equipment: GE LM2500 Gas Turbine Generator - 21 MW ( IHI Package ) ; Quantity: 2 units.
Overview: Retrofit existing Fuel Control System with Woodward Fuel Valve.
Customer/End User: ILSAS ( Institute Latihan Sultan Ahmad Shah ), TNB Integrated Learning Solutions, Malaysia.
Status: Completed (July 2009)
Equipment: Power Plant Simulator
Overview: - Supply Simulator project using Wonderware HMI system with Vipa PLC (program with Siemens Simatic Manager/ Step 7 Professional) for Suruhanjaya Tenaga ( Energy Commission) Examination.
Customer/End User:Tractors Malaysia Berhad / Royal Malaysian Navy
Status: Completed
Equipment:
- Caterpillar ( 3600 series - x 2 units) Main Propulsion for each vessel
- Caterpillar ( 3400 Series - x 4 units) Diesel Generators for each vessel
Overview: - Total 4 vessels.
- Supply Main Engine Controller ( Woodward 723 Plus) and Commissioning.
- Integrate with Allen Bradley PLC & HMI.
- Supply Diesel Generator Controller ( Woodward 2301D ) and Commissioning.
Integrate with Telemecanique PLC.
Customer/End User:Global Process Control/ Petrofac, Malaysia.
Status: Completed ( 2006 )
Equipment:
- Caterpillar Diesel Generatig Sets, 1 MW each. ( x 5 units ).
- Supply and Commission Woodward Generator Power Management System.
- Supply and commssion New Engine Control Panel and Excitation System.
Customer/End User: Global Process System, Dubai.
Status: Completed ( 2006 )
Equipment: Maleo Producer - Diesel Generators, 1 MW each. ( x 4 units ).
Overview: - Retrofit Power Generation & Power Management System with Woodward Generator Controller.
- Initial stage of installation and commissioning was done in Dubai and Sharjah, UAE.
- Later the final commissioning was done in Surabaya where the platform operates.
Customer/End User: Nanyang Energy, Thailand
Status: Completed ( 2005 ).
Equipment: KKK Steam Turbine, 1.5 MW.
Overview:
- New Building of power plant. Commissioning Woodward 505E Steam Turbine Control,with Woodward Power Management Controller.
- Integration with Allen Bradley PLC and RSView HMI.
Customer/End User: Tamco Switchgear (M) Sdn. Bhd.
Status: Completed ( April 2011 )
Equipment: Generator Control Systems & Power Management System - 11KV System, 1.6 MW each, x 3 units.
Overview: - Supply and commission Woodward Generator Controller on 1.6 MW Mitsubishi Diesel Engines.
Customer/End User: Ethylene Malaysia Sdn. Bhd (EMSB), Malaysia.
Status: Completed (June 2008)
Equipment: Gas Compressors ( x 2 units )
Overview: - Retrofit Old type Woodward 505 to New Redundant Woodward 505R.
Customer/End User: SESB Tawau Power Plant ( Sabah Electricity Sdn. Bhd ), Malaysia.
Status: Completed (December 2008)
Equipment: GE LM2500, Gas Turbine Generator - 19 MW ( x 1 unit)
Overview: - Retrofit obsolete 501 Digital Control to Woodward Gas Turbine Control and Ifix HMI ( Ge fanuc ).